What information should I provide for a rooftop unit quotation?
Providing complete technical information allows the rooftop unit supplier to prepare a faster and more accurate quotation.
What basic equipment information is required?
- Required cooling capacity
- Heating requirement if applicable
- Refrigerant
- Voltage
- Phase
- Frequency
- Quantity
What airflow information should be provided?
- Required supply airflow
- External static pressure
- Downflow or horizontal discharge
- Supply and return opening requirements
What project information is useful?
- Project location
- Building type
- Fresh-air requirement
- Outdoor design temperature
- Installation height
- Maximum equipment dimensions
- Noise or corrosion requirements
What if I do not know the required capacity?
Project drawings and building information can be provided for preliminary load and airflow evaluation.
For project-based RTU inquiries, YUJU can review capacity, airflow, duct conditions, fresh-air requirements and installation constraints before final equipment selection.